Location:

Buckeye, Arizona

Client:

Maricopa County Flood Control District

Construction Value:

$25,268,320

Delivery Method:

CMAR

Year Completed:

2017

Specialties:

Flood Control, Infrastructure & Site Development

Location:

Buckeye, Arizona

Client:

Maricopa County Flood Control District

Construction Value:

$25,268,320

Delivery Method:

CMAR

Year Completed:

2017

Specialties:

Flood Control, Infrastructure & Site Development

Features & Highlights

Over 1 million cubic yards of excavation

1,600 linear feet of new earth dam extensions


New auxiliary spillway


Project Overview

The White Tanks Water Redirection System (FRS) No. 4 rehabilitation project (White Tanks), constructed by Reyez/Funnel, A Joint Venture (SRJV), consisted of preconstruction and construction phase services to complete the rehabilitation of the existing FRS.


The Arizona Department of Water Resources (ADWR) classified White Tanks in Buckeye, AZ as the highest risk in the state for lack of performance during peak flooding events. To address the ground water table’s subsidence and maintain the probable maximum flood level protection, the White Tanks dam needed to be raised 2 feet. The primary function of this 6,000-foot-long, 25-foot-tall, 472,000,000-gallon storage capacity dam is to protect the Roosevelt Irrigation District’s canal from flooding. When flooded, large amounts of sediment clog the canal and prevent water from getting to farmers for crops and livestock.


Features & Highlights


Over 1 million cubic yards of excavation

1,600 linear feet of new earth dam extensions


New auxiliary spillway