SVWTP, Phase I & II (Water Treatment Plant)


Reyez Construction Projects

SVWTP, Phase I & II (Water Treatment Plant)




Reyez Construction Projects

SVWTP, Phase I & II (Water Treatment Plant)

SVWTP, Phase I & II (Water Treatment Plant)

Location:

Gilbert, Arizona

Client:

Town of Gilbert

Delivery Method:

CMAR


Year Completed:

Phase 1: 2009; Phase 2: 2018


Specialties:

Water & Wastewater

Year Completed:

Phase 1: 2009; Phase 2: 2018

Specialties:

Water & Wastewater

Location:

Gilbert, Arizona

Client:

Town of Gilbert

Delivery Method:

CMAR


Year Completed:

Phase 1: 2009; Phase 2: 2018


Specialties:

Water & Wastewater

Year Completed:

Phase 1: 2009; Phase 2: 2018

Specialties:

Water & Wastewater

Features & Highlights


Sand ballasted flocculation used to reduce the plant footprint for future capacity on-site

Included ozone generation system and sodium hypochlorite generation system

Reyez provided plant operations services during the initial phase.

Project completed two months ahead of schedule and under budget

Project Overview

Reyez Construction constructed Phase I of this surface water treatment plant with an initial 24 MGD of capacity on a greenfield site and then constructed a second 24 MGD treatment train to take the total production capacity to 48 MGD.


To meet Gilbert’s CIP budget, the team had to identify value engineering and constructability savings to keep the project within the budget. The project team identified $17M in potential savings based on the 30% estimate. The City approved approximately $13M in VE savings, meeting the necessary budget. All proceeds were returned to the Owner. Based on the team’s understanding of the mechanical systems, we were able to develop a new layout for the dewatering facility to eliminate the need for a new belt filter press by relocating an existing filter press, saving $544,332.


Features & Highlights


Sand ballasted flocculation used to reduce the plant footprint for future capacity on-site

Included ozone generation system and sodium hypochlorite generation system

Reyez provided plant operations services during the initial phase.

Project completed two months ahead of schedule and under budget