Location:

Superior, Arizona

Client:

Resolution Copper Mining

Construction Value:

$9,127,653

Delivery Method:

Design-Bid-Build

Year Completed:

2014

Specialties:

Mining

Location:

Superior, Arizona

Client:

Resolution Copper Mining

Construction Value:

$9,127,653

Delivery Method:

Design-Bid-Build

Year Completed:

2014

Specialties:

Mining

Features & Highlights


Fast track design with complicated schedule

High performance refrigeration system

Bulk air fans, chillers and condensed cooling towers

Large diameter Victaulic pipe

Project Overview

As Resolution Copper Mining (RCM) constructed the No. 10 Shaft, they encountered a unique condition over 7,000 feet underground. The air temperature exceeded MSHA safety standards for human occupation.  RCM had to move fast to provide a solution to cool the underground mine so that the team could continue the underground construction.  To meet the schedule and budget, RCM developed a plan for a fast track design-bid-build project. They needed a proven industrial contractor to take on the risks and complications of the schedule. Reyez Construction was chosen to be the contractor to construct a state-of-the-art high-performance refrigeration system to meet the challenges of a 7,000-foot-deep shaft with rock temperatures reaching 170 degrees.


Features & Highlights


Fast track design with complicated schedule

High performance refrigeration system

Bulk air fans, chillers and condensed cooling towers

Large diameter Victaulic pipe