City of Chandler Wastewater Recycling Facility


Reyez Construction Projects

City of Chandler Wastewater Recycling Facility




Reyez Construction Projects

City of Chandler Wastewater Recycling Facility

Location:

Arizona

Client:

Confidential

Delivery Method:

Progressive Design-Build

Year Completed:

2014

Specialties:

Sustainability, Water & Wastewater

Location:

Arizona

Client:

Confidential

Delivery Method:

Progressive Design-Build

Year Completed:

2014

Specialties:

Sustainability, Water & Wastewater

Features & Highlights


Team’s approach to permitting enabled an accelerated schedule through phased construction packages

Facility reliably achieves 90% recovery from the RO systems and 97% for the whole system using a High pH Reverse Osmosis (HpRO) process

Value engineering provided the reuse of over $20M of equipment.

Features thermal brine concentration units and other advanced treatment technologies

Project Overview

The City of Chandler Wastewater Recycling Facility is a 1.5 MGD industrial wastewater treatment facility that processes manufacturing reject process water. When the client was faced with water challenges that threatened to impact their expansion plans, the project team established planning projections and generated a preliminary design to meet short-term needs and provide flexibility to accommodate changing flows and future loads.


The team was able to fast-track the detailed design, construction, commissioning, and short-term operation of the facility to meet the client’s needs. The facility maximized the water recovery, reduced the overall brine flow to the existing evaporation ponds, and reduced the volume of potable water use at the facility, by providing high quality recycled water for use in cooling. Due to the wide fluctuation in incoming brine quality, the lime softening process had to be designed and operated to respond to these changes rapidly and produce RO feed water with sufficient and consistent water quality. RO reject was sent to a Brine Concentrator for further volume reduction and recovery of distillate.


After a successful startup, the team identified operational modifications which supported the treatment of cooling tower blowdown and provided significant operational flexibility for the client.


Features & Highlights


Team’s approach to permitting enabled an accelerated schedule through phased construction packages

Facility reliably achieves 90% recovery from the RO systems and 97% for the whole system using a High pH Reverse Osmosis (HpRO) process

Value engineering provided the reuse of over $20M of equipment.

Features thermal brine concentration units and other advanced treatment technologies