cropped-LOGO-REYEZ.png


Reyez Construction Projects

University of Arizona Student Success District


Reyez Construction Projects

University of Arizona Student Success District




Reyez Construction Projects

University of Arizona Student Success District

Location:

Tucson, Arizona

Client:

University of Arizona

Construction Value:

$61,409,000

Delivery Method:

Design-Build 1 Step

Year Completed:

2021

Specialties:

Higher Education

Location:

Tucson, Arizona

Client:

University of Arizona

Construction Value:

$61,409,000

Delivery Method:

Design-Build 1 Step

Year Completed:

2021

Specialties:

Higher Education

Features & Highlights


Bartlett Academic Success Center - New, 60,000-square-foot, four-story student services building

Bear Down Gym – Restoration of 70,000-square-foot historic building, and repurposing for a broad spectrum of student services programs


Main Library and Albert B. Weaver Science-Engineering Library – Remodeling of portions of these services to modernize library services

Project Overview

The Student Success District, Reyez Construction’s 18th project on the University of Arizona campus, creates a campus core that includes the best of the University’s academics, student support and success services. The project has transformed the Main Library and the Albert B. Weaver Science-Engineering Library, and added a new four-story student success building.  The renovation and remodeling of Bear Down Gym, originally constructed in 1926, completes this new interconnected district, which in addition to the building improvements, also includes site development, creating new outdoor spaces designed for student use. The four buildings are linked by canopies, walkways and bridges.  The new district encourages students to move seamlessly between spaces that provide a full range of services and expertise, in support of their academic goals in preparation of their future careers. Students can move from group meetings in expanded collaboration spaces to tutoring sessions to workout classes.


This project is in one of the busiest parts of the campus and has a limited staging area. The Reyez team worked in multiple locations all at the same time and coordinated heavily with the university’s Planning, Design and Construction department to ensure proper sequencing, safety, and quality during construction. The project team conducted the majority of heavy demolition work during the summer months in order to minimize disruptions to campus activities and erected temporary partitions to manage access in various parts of the buildings.  Reyez Construction also developed and posted pedestrian access maps as well as A-frame signage around the campus to make it easier to navigate around construction activities.


Features & Highlights


Bartlett Academic Success Center - New, 60,000-square-foot, four-story student services building

Bear Down Gym – Restoration of 70,000-square-foot historic building, and repurposing for a broad spectrum of student services programs


Main Library and Albert B. Weaver Science-Engineering Library – Remodeling of portions of these services to modernize library services

View OTher projects

Contractors & Construction Managers Since 1986.

Learn more about our services
Get A Quote Today